Mirzak Automated Monorail System: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
m Text replacement - "Corumm" to "Daxia" |
||
Line 17: | Line 17: | ||
| owner = Mirzak Transport Authority | | owner = Mirzak Transport Authority | ||
| area served = [[Mirzak]] Urban area | | area served = [[Mirzak]] Urban area | ||
| locale = [[Mirzak]], [[ | | locale = [[Mirzak]], [[Daxia]] | ||
| transit_type = Rapid transit monorail metro | | transit_type = Rapid transit monorail metro | ||
| lines = 6 | | lines = 6 | ||
Line 53: | Line 53: | ||
}} | }} | ||
The '''Mirzak Automated Monorail System (MAMS)''' is the autonomously driven monorail of the city of [[Mirzak]], capital of [[ | The '''Mirzak Automated Monorail System (MAMS)''' is the autonomously driven monorail of the city of [[Mirzak]], capital of [[Daxia]]. As of 2028 it consisted of six lines with a total track length of 516 km (320.8 mi). All six lines are heavy capacity monorails, with some stretches of the track suspended up to a height of fifty meters to better navigate the congested urban landscape. The onboard direction computers were designed by the Transportation Technological Institute to require no human input during travel. To keep up with demand, three extra lines are planned for completion by 2035. | ||
==History== | ==History== | ||
===Creation=== | ===Creation=== | ||
Line 62: | Line 62: | ||
===Technology=== | ===Technology=== | ||
===Accidents=== | ===Accidents=== | ||
[[Category: | [[Category:Daxia]] | ||
[[Category:Transportation]] | [[Category:Transportation]] | ||
[[Category:IXWB]] | [[Category:IXWB]] |
Latest revision as of 01:08, 29 April 2023
Overview | |
---|---|
Native name | 机器人自动单轨 |
Owner | Mirzak Transport Authority |
Area served | Mirzak Urban area |
Locale | Mirzak, Daxia |
Transit type | Rapid transit monorail metro |
Number of lines | 6 |
Line number | Hyperloop, 1, 2, 3, 4, 5 |
Number of stations | 103 |
Daily ridership | 4.200 million avg |
Annual ridership | 1.53 billion |
Chief executive | Ren Huoche |
Headquarters | 123 Daogui Road, Tielu District, Mirzak |
Operation | |
Began operation | 10 October 2011 |
Operator(s) | Mirzak Transport Authority |
Technical | |
System length | 320.8 mi (516.3 km) |
Track gauge | 1,435 mm |
The Mirzak Automated Monorail System (MAMS) is the autonomously driven monorail of the city of Mirzak, capital of Daxia. As of 2028 it consisted of six lines with a total track length of 516 km (320.8 mi). All six lines are heavy capacity monorails, with some stretches of the track suspended up to a height of fifty meters to better navigate the congested urban landscape. The onboard direction computers were designed by the Transportation Technological Institute to require no human input during travel. To keep up with demand, three extra lines are planned for completion by 2035.