Aluna Channel Bridge-Tunnel: Difference between revisions
Jump to navigation
Jump to search
m (Insui moved page Sanoria Channel Bridge-Tunnel to Aluna Channel Bridge-Tunnel without leaving a redirect) |
mNo edit summary |
||
Line 1: | Line 1: | ||
{{wip}} | {{wip}} | ||
{{Infobox bridge | {{Infobox bridge | ||
| name = | | name = Aluna Channel Bridge-Tunnel | ||
| image = Sutong_Yangtze_River_Bridge.JPG | | image = Sutong_Yangtze_River_Bridge.JPG | ||
| image_upright = | | image_upright = | ||
Line 9: | Line 9: | ||
| crosses = [[Aluna Channel]] | | crosses = [[Aluna Channel]] | ||
| locale = East of [[New Venceia]] and west of [[Sanova, São Ricardo]] | | locale = East of [[New Venceia]] and west of [[Sanova, São Ricardo]] | ||
| official_name = | | official_name = Aluna Channel Bridge-Tunnel and Causeway System | ||
| other_name = SCBT | | other_name = SCBT | ||
| named_for = [[Aluna Channel]] (portmanteau of Alexandria and Fortuna) | | named_for = [[Aluna Channel]] (portmanteau of Alexandria and Fortuna) | ||
Line 48: | Line 48: | ||
| collapsed = <!--For current bridge--> | | collapsed = <!--For current bridge--> | ||
| closed = | | closed = | ||
| replaces = | | replaces = Aluna Channel Ferry | ||
| replaced_by = | | replaced_by = | ||
| traffic = | | traffic = | ||
Line 54: | Line 54: | ||
}} | }} | ||
The ''' | The '''Aluna Channel Bridge-Tunnel''', officially the '''Aluna Channel Bridge-Tunnel and Causeway System''', is a {{convert|59.4|km|mi|1}} crossing over the [[Aluna Channel]] between the [[Cartadania]]n states of [[Alexandria]] and [[São Ricardo]]. Connecting the city of [[New Venceia]] and [[Ricardo County, São Ricardo|Ricardo County]], it forms the western portion of the larger [[Fortuna Expressway]] and more largely, [[Cartadania Interstate Highway 90|IH-90]]. | ||
Completed in 2014, the SCBT is the second-most expensive individual federal highway project in the country, preceded only by the [[Marée Channel Bridge-Tunnel]], which adjoins the Fortuna Expressway and connects São Ricardo to [[Milan]]. | Completed in 2014, the SCBT is the second-most expensive individual federal highway project in the country, preceded only by the [[Marée Channel Bridge-Tunnel]], which adjoins the Fortuna Expressway and connects São Ricardo to [[Milan]]. |