8,717
edits
mNo edit summary Tag: 2017 source edit |
Tag: 2017 source edit |
||
Line 640: | Line 640: | ||
====Energy and electricity==== | ====Energy and electricity==== | ||
{{Further|21st_Century_Burgoignesc_Power_Projection_Stratagem# | {{Further|21st_Century_Burgoignesc_Power_Projection_Stratagem#BORA_Waste_to_Energy_CompactEnergy policy in Burgundie|Science and Technology in Burgundie#Energy}} | ||
<gallery mode="packed"> | <gallery mode="packed"> | ||
File%3AHolyrood_Thermal_Generating_Station.jpg|Thermal powerplant | File%3AHolyrood_Thermal_Generating_Station.jpg|Thermal powerplant | ||
Line 648: | Line 648: | ||
The thermal energy plant has a generating capacity of 624.5 MW. It was placed in service in [[1971]] with two 150 MW units. A third 150 MW unit was added in [[1980]] to increase the output to 450 MW. In [[1988]]/[[1989]] the original two units were modified to increase the plant capacity to 490 MW. In January [[2014]], six–1.825 MW diesel generators were installed for the purpose of providing black start power. In [[2015]], a 123.5 MW diesel combustion turbine was installed. | The thermal energy plant has a generating capacity of 624.5 MW. It was placed in service in [[1971]] with two 150 MW units. A third 150 MW unit was added in [[1980]] to increase the output to 450 MW. In [[1988]]/[[1989]] the original two units were modified to increase the plant capacity to 490 MW. In January [[2014]], six–1.825 MW diesel generators were installed for the purpose of providing black start power. In [[2015]], a 123.5 MW diesel combustion turbine was installed. | ||
=====Agrinergie===== | |||
Main article: {{wpl|Agrivoltaics}} | |||
====Phone service and internet==== | ====Phone service and internet==== |
edits