Wintergen: Difference between revisions

Jump to navigation Jump to search
mNo edit summary
Tags: Mobile edit Mobile web edit Advanced mobile edit
Tag: 2017 source edit
Line 298: Line 298:


====Energy and electricity====
====Energy and electricity====
{{Further|21st_Century_Burgoignesc_Power_Projection_Stratagem#BORA_Waste_to_Energy_CompactEnergy policy in Burgundie|Science and Technology in Burgundie#Energy|Energy policy in Burgundie}}
<gallery mode="packed">
</gallery>
The [[21st_Century_Burgoignesc_Power_Projection_Stratagem#BORA_Waste_to_Energy_Compact|BORA Waste to Energy Compact]] went into effect in [[2027]] with construction of two Waste to Energy power planta starting in [[2028]]. The two planta built in Wintergen generates approximately 208,000 kWh/day with a waste reduction capacity of 2200,000 kg/day.
Most of the electricity in Wintergen is provided by the Remalaund Power Factory outside of Volcamor. The Remalaud Power Factory is a {{wp|Geothermal_power#Binary_cycle_power_stations|Binary cycle, geothermal power station}} built in [[2012]] to replace the flash steam station geothermal plant that had been built in [[1984]], itself replacing a peat burning station that had previously powered the island.
Most of the electricity in Wintergen is provided by the Remalaund Power Factory outside of Volcamor. The Remalaud Power Factory is a {{wp|Geothermal_power#Binary_cycle_power_stations|Binary cycle, geothermal power station}} built in [[2012]] to replace the flash steam station geothermal plant that had been built in [[1984]], itself replacing a peat burning station that had previously powered the island.