Sudmoll: Difference between revisions

Jump to navigation Jump to search
Tag: 2017 source edit
Tag: 2017 source edit
Line 484: Line 484:


Through an infrastructure investment grant, the [[Levantine Union]] has committed ₮8 million to construct tidal power generators, but the project is currently stalled by local fishermen who are concerned about the disturbances the generators will cause to their livelihood. The project is still expected to move forward and the projected completion date is [[2029]]. A feasibility study was conducted and determined that solar would be unreliable due to the long monsoon seasons, and nuclear was too expensive for the demand.
Through an infrastructure investment grant, the [[Levantine Union]] has committed ₮8 million to construct tidal power generators, but the project is currently stalled by local fishermen who are concerned about the disturbances the generators will cause to their livelihood. The project is still expected to move forward and the projected completion date is [[2029]]. A feasibility study was conducted and determined that solar would be unreliable due to the long monsoon seasons, and nuclear was too expensive for the demand.
====Agrinergie====
=====Agrinergie=====
[[File:Sheep_living_under_La_Ola_Solar_Farm_on_Lanai_Hawaii.jpg|right|250px]]
[[File:Sheep_living_under_La_Ola_Solar_Farm_on_Lanai_Hawaii.jpg|right|250px]]
Main article: {{wpl|Agrivoltaics}}
Main article: {{wpl|Agrivoltaics}}