Athfhuaim-class submarine: Difference between revisions

m
no edit summary
mNo edit summary
Tag: 2017 source edit
mNo edit summary
Tag: 2017 source edit
Line 55: Line 55:
{{WIP}}
{{WIP}}


The '''Athfhuaim'''-class (Aen. '''Resound'''<ref>Literally translated, ''Echo'', ''Resound'' is used as a noun in this case.</ref>) was a type of {{wp|Cruise-missile submarine}} developed and built by [[Faneria]]. Built off of technical plans of the Caphirian [[Portunus-class submarine|Portunus]] class and lessons learned from Faneria's first nuclear-powered submarine, it aimed to fill the same role as the contemporarily-developed Caphirian [[Venilia-class submarine|Venilia class]] as a long-range, ambush-based antishipping submarine cabable of harassing enemy fleet groups and destroying vulnerable shipping.  
The '''Athfhuaim'''-class (Aen. '''Resound'''<ref>Literally translated, ''Echo''; ''Resound'' is used as a noun in this case.</ref>) was a type of {{wp|Cruise-missile submarine}} developed and built by [[Faneria]]. Built off of technical plans of the Caphirian [[Portunus-class submarine|Portunus]] class and lessons learned from Faneria's first nuclear-powered submarine, it aimed to fill the same role as the contemporarily-developed Caphirian [[Venilia-class submarine|Venilia class]] as a long-range, ambush-based antishipping submarine cabable of harassing enemy fleet groups and destroying vulnerable shipping.  


Whereas the Caphirian navy could afford to fund the production of whole squadrons of such vessels for major naval engagements, the [[Office of the National Army (Faneria)|Fhainnin Army]] of the 1970s and 1980s both lacked the budget to fund a squadron-oriended cruise missile submarine program and the desire to commission a large class of nuclear-powered warships while only working off the single in-house example set by the ''Cinneadh''. As a result, the initial proposal of twelve vessels was reduced to a total of eight completed hulls.
Whereas the Caphirian navy could afford to fund the production of whole squadrons of such vessels for major naval engagements, the [[Office of the National Army (Faneria)|Fhainnin Army]] of the 1970s and 1980s both lacked the budget to fund a squadron-oriended cruise missile submarine program and the desire to commission a large class of nuclear-powered warships while only working off the single in-house example set by the ''Cinneadh''. As a result, the initial proposal of twelve vessels was reduced to a total of eight completed hulls.
3,909

edits