Gaisgeil-class submarine: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
|||
Line 1: | Line 1: | ||
{{WIP}} | |||
The '''Gaisgeil''' (English: '''Gallant''')-class submarine is a type of nuclear ballistic missile and attack submarine produced in the 1980s-90s by [[Faneria]]. It was constructed by [[Sethsport Shipyards United]], and was the first strategic attack submarine fielded by Faneria. It remains the only nuclear submarine in service with Faneria, but is slated to be replaced by the [[Charcarodon-class submarine|Charcarodon]], a jointly produced Fhainnin-[[Pelaxia|Pelaxian]] project. | The '''Gaisgeil''' (English: '''Gallant''')-class submarine is a type of nuclear ballistic missile and attack submarine produced in the 1980s-90s by [[Faneria]]. It was constructed by [[Sethsport Shipyards United]], and was the first strategic attack submarine fielded by Faneria. It remains the only nuclear submarine in service with Faneria, but is slated to be replaced by the [[Charcarodon-class submarine|Charcarodon]], a jointly produced Fhainnin-[[Pelaxia|Pelaxian]] project. | ||
{|{{Infobox ship begin <!-- submarine classes --> | {|{{Infobox ship begin <!-- submarine classes --> |
Revision as of 19:18, 27 September 2022
This article is a work-in-progress because it is incomplete and pending further input from an author. Note: The contents of this article are not considered canonical and may be inaccurate. Please comment on this article's talk page to share your input, comments and questions. |
The Gaisgeil (English: Gallant)-class submarine is a type of nuclear ballistic missile and attack submarine produced in the 1980s-90s by Faneria. It was constructed by Sethsport Shipyards United, and was the first strategic attack submarine fielded by Faneria. It remains the only nuclear submarine in service with Faneria, but is slated to be replaced by the Charcarodon, a jointly produced Fhainnin-Pelaxian project.
Class overview | |
---|---|
Builders: | Sethsport Shipyards United |
Operators: | Faneria |
Succeeded by: | Charcarodon |
Built: | 1979-1998 |
In commission: | 1983-2027 |
Planned: | 12 |
Completed: | 8 |
Cancelled: | 4 |
Laid up: | 3 |
Scrapped: | 5 |
General characteristics | |
Type: | Nuclear Ballistic Missile Submarine |
Length: | 420 ft (128 m) |
Beam: | 33 ft (10 m) |
Draft: | 32 ft (9.8 m) |
Propulsion: |
|
Speed: | 22 knots |
Range: | Unlimited, 2.5 years |
Endurance: | 88+ days submerged |
Test depth: | >1300 ft (~400 m) |
Complement: | 110 crew |
Armament: |
|
Design
Reactor Issues
Shipyard Capability
Armament and performance
Service History
Ships in Class
Ship | Ship Code | Status |
---|---|---|
Gaisgeil | LB(M)-1 | Decommissioned |
Eleglass | LB(M)-2 | Decommissioned |
Harthglen | LB(M)-3 | In Refit |
Maen Tin | LB(M)-6 | Decommissioned |
Maen Or | LB(M)-7 | Decommissioned |
Maen Sur | LB(M)-9 | Decommissioned |
Oreachas | LB(M)-10 | In Service |
Suhran | LB(M)-11 | In Refit |